Engineering and Consulting

section-d2c7343
Sahagún

Engineering contact for the construction and start up of a Gas Treatment Plant of 130 MMSCFD.

ingeniería Jobo 130

Detail engineering for a gas treatment plant with production capacity 130 MMSCFD.

Location: Sahagún - Cordoba.
Duration: 4 months (06, 2018 - 10, 2018)

section-22e0144
Paratebueno

Engineering for two compression station on Cusiana-Apiay and Villavicencio-Ocoa gas pipeline.

Civil, electrical, mechanical, piping and instrumentation designs for basic and detail engineering of: Villavicencio gas compression station located on Cusiana-Apiay gas pipeline from 14.1 MMSCFD to 26 MMSCFD.

Paratebueno gas compression station located on Apiay-Villavicencio pipeline from 30 MMSCFD to 64 MMSCFD.

Location: Bogotá.
Duration: 4 months (04, 2017 - 08, 2017).

https://mlvfu1xk6qj3.i.optimole.com/w:auto/h:auto/q:mauto/f:avif/https://ccringenieros.com/wp-content/uploads/2021/03/ingenieria-tgi-paratebueno-villavicencio.png
section-5162bb5
Cartagena

Engineering for the scope: FLTE engineering: engineering for the adequacy of facilities of filling machines in dow agrosciences plant in Cartagena. Growth engineering: engineering for intstallation of new filling machines in the main areas of insecticide and herbicide plants in Dow agrosciences plant in Cartagena.

https://mlvfu1xk6qj3.i.optimole.com/w:auto/h:auto/q:mauto/f:avif/https://ccringenieros.com/wp-content/uploads/2021/03/ingenieria-dow.png

Growth engineering: engineering for the adequacy of facilities for the facilities of filling machines. including: pump changes, melt pool relocation, engineering for the installation of 50 isometrics, electric oven relocation, lighting of new scale casette, adaptation of facilities in tanks.

Facility engineering: engineering for the installation of the new filling machines in the two main areas of the insecticide and herbicide plant. including: new support routes, civil adaptation of the areas, new electrical installations, control signals, development of 120 new route isometries, necessary facilities for the ventilation of the machines development and development of new sockets, developing machines, developing machines, developing machines, connections, new general lighting for the two store.

Ubicación: Cartagena - Bolivar - Bogotá.
Duración: 5 meses (10, 2016 - 03, 2017).

section-f618ecf
Bogotá

Front end engineering design (feed) and detailed engineering required for the design, manufacturing, construction, assembly, commissioning and startup of a 100 MMSCFD gas treatment plant within "El Jobo" station, Sahagún city, department of Cordoba, Colombia.

Civil, electrical, mechanical, piping and instrumentation designs for front end engineering design (feed) and detailed engineering for the 100 MMSCFD gas treatment plant within "El Jobo" station.

Location: Bogotá.
Duration: 3 months (07, 2015 - 10, 2015).

https://mlvfu1xk6qj3.i.optimole.com/w:auto/h:auto/q:mauto/f:avif/https://ccringenieros.com/wp-content/uploads/2021/03/ingenieria-jobo-100.png
section-de8074a
Bogotá

Detailed engineering for the modifications to the pumping and complementary systems for the increase in capacity of an oil pipeline - project delta 35.

https://mlvfu1xk6qj3.i.optimole.com/w:auto/h:auto/q:mauto/f:avif/https://ccringenieros.com/wp-content/uploads/2021/03/ingenieria-delta-35.png

"Delta 35" detailed engineering
the disciplines involved in this project were: process, mechanical, civil, electrical, instrumentation and control.

Location: Bogotá.
Duration: 11 months (04, 2014 - 03, 2015).

section-dc372e9
Bogotá

"Campo Tua" station - "bloque Llanos 34" detailed engineering, Monterrey, departement of Casanare, Colombia.

Detailed engineering, production facilities, "Campo Tua" station.

Location: Bogotá.
Duration: 2 months (11, 2013 - 01, 2014).

https://mlvfu1xk6qj3.i.optimole.com/w:auto/h:auto/q:mauto/f:avif/https://ccringenieros.com/wp-content/uploads/2021/03/ingenieria-campo-tua.png