Detail engineering for a gas treatment plant with production capacity 130 MMSCFD.
Location: Sahagún - Cordoba.
Duration: 4 months (06, 2018 - 10, 2018)
Civil, electrical, mechanical, piping and instrumentation designs for basic and detail engineering of: Villavicencio gas compression station located on Cusiana-Apiay gas pipeline from 14.1 MMSCFD to 26 MMSCFD.
Paratebueno gas compression station located on Apiay-Villavicencio pipeline from 30 MMSCFD to 64 MMSCFD.
Location: Bogotá.
Duration: 4 months (04, 2017 - 08, 2017).
Growth engineering: engineering for the adequacy of facilities for the facilities of filling machines. including: pump changes, melt pool relocation, engineering for the installation of 50 isometrics, electric oven relocation, lighting of new scale casette, adaptation of facilities in tanks.
Facility engineering: engineering for the installation of the new filling machines in the two main areas of the insecticide and herbicide plant. including: new support routes, civil adaptation of the areas, new electrical installations, control signals, development of 120 new route isometries, necessary facilities for the ventilation of the machines development and development of new sockets, developing machines, developing machines, developing machines, connections, new general lighting for the two store.
Ubicación: Cartagena - Bolivar - Bogotá.
Duración: 5 meses (10, 2016 - 03, 2017).
Civil, electrical, mechanical, piping and instrumentation designs for front end engineering design (feed) and detailed engineering for the 100 MMSCFD gas treatment plant within "El Jobo" station.
Location: Bogotá.
Duration: 3 months (07, 2015 - 10, 2015).
"Delta 35" detailed engineering
the disciplines involved in this project were: process, mechanical, civil, electrical, instrumentation and control.
Location: Bogotá.
Duration: 11 months (04, 2014 - 03, 2015).
Detailed engineering, production facilities, "Campo Tua" station.
Location: Bogotá.
Duration: 2 months (11, 2013 - 01, 2014).